John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry
John McGowan and Sons Drainage Excavation Ashpalt Masonry John McGowan and Sons Drainage Excavation Ashpalt Masonry
John McGowan and Sons Drainage Excavation Ashpalt Masonry

Masonry and Concrete work

Concrete Slab

Performed by removing existing material as required. Fine grading and compacting sub base with vibratory equipment. Then placing concrete in a depth of 4”-10” slab. Concrete strength shall range from 3,000-5,000 psi depending upon requirements set forth. All concrete shall be reinforced with wire mesh as required.

Concrete Curb

We shall excavate a new trench. Compact existing sub base and establish grade. Wood forms to be set along string line set in the field. Concrete shall be placed between forms with expansion joint set every 20 feet. Forms to be removed and wood floated to meet desired finish.

Concrete Pavers

Existing material is excavated 6”-8” in depth depending upon soil conditions. Install graded base aggregate to desired depth then compact. Compact aggregate with a vibratory plate compactor in lifts to achieve proper compaction rate. Install 1” of fine Long Island sand. Set new pavers in a pattern to be agreed upon prior to installation. Sweep in additional sand between all stones as needed. Compact in place using a vibratory plate compactor to set stone. Repeat until all joints are filled with sand.

Curbing (Granite/ Belgium Block)

We shall excavate a new trench and prepare subgrade to meet proper elevation. Block shall be placed in 4”-6” of concrete. Mortar for joints between adjacent block shall be a mixture of cement and sand.

Paving Stones

The area will be prepared accordingly prior to installation. Excavation will allow for placement of a foundation. Stone bedding is leveled and prepared before installing the paving stones. The stones are then placed at a 90-degree angle according to the chosen design.

Aprons (Granite/ Belgium Block)

We shall excavate and remove existing material to a depth of 10”-12” depending upon sub base material. A new concrete slab with wire mesh steel reinforcement is to be installed. Install, set and point block by using a mixture of Portland cement and sand.

Back to Services

John McGowan and Sons Drainage Excavation Ashpalt Masonry
gg
John McGowan and Sons Drainage Excavation Ashpalt Masonry

Licensed And Insured in Nassau & Suffolk County

We Currently Have an A+ Rating with the Better Business Bureau